Location: Borehamwood
Client: Aldenham School
Timescale: 16 weeks
Value: £90k
As part of the ongoing refurbishment and upgrade of the school’s portfolio, we were appointed to work alongside the main contractor to refurbish the entire science block
Work included:
- Strip out of existing installation and make safe to allow for demolition.
- Design and installation of new sub-main and distribution to all labs and general areas.
- Installation of safety stop controls for gas and electric outlets in the labs.
- Installation of intelligent lighting systems, and emergency lighting.
- Installation of entire CAT 6 data infrastructure throughout the building.